Skip to content

Aerospace Supplier Quality

Use the right drawing every time you review a part.

Give reviewers the right drawing, the matching checklist, and a clear list of what’s missing.

A curved, twisted satin-silver turbine blade stands on a matte graphite fixture with small graphite blocks linked by thin cobalt-blue pins.A curved, twisted satin-silver turbine blade stands on a matte graphite fixture with small graphite blocks linked by thin cobalt-blue pins.
Illustrative workflow

See it in action.

One worked situation, start to finish. An example, not a customer record.

  1. 1

    A supplier sends its first part

    The papers for a first part arrive, with the usual mix of reports and certificates.

  2. 2

    Checked against the latest drawing

    Duplex compares them with the current drawing and its checklist, and points out the paper that’s missing.

  3. 3

    A clean file for the reviewer

    The reviewer gets the file, the gap and the checklist in one place, and makes the call.

More ways to use it.

  • See what changed on a drawing

    Spot the difference between revisions before anyone reviews against the old one.

  • Keep exceptions where they belong

    An exception stays with the supplier and part it was granted for, and nowhere else.

What to measure in a pilot.

Run the same job with your current setup and with Duplex, and compare:

Measures

  • Missing papers
  • Old drawings used
  • Time to review

Where to go next.

Try it on one job.

Choose something your team does often. Compare how it goes with your current setup and with Duplex.